Sector, industry and process cooling

Multi-chiller process plants. Coordinated. Optimised every minute.

Process plants, where cooling affects product quality and cost, and coordinating multiple chillers cuts electricity use while keeping operation reliable.

MeasuredStadtwerke Karlsruhe, verified

Around 40 percent measured electricity savings on a live municipal plant.

~40%
Measured savings
Stadtwerke Karlsruhe, first season
44%
Normalised savings
Weather and load normalised
5 mo.
Payback
From commissioning
ProjectedDunkel, projected case

A projected analysis for the Dunkel process-cooling plant.

~50%
About 50%, projected operating-cost savings
Christian Dunkel GmbH, projected analysis

Concept planning projecting about 50% lower operating cost, by combining system optimisation with thermal storage that shifts consumption away from the most expensive hours.

The Dunkel analysis is a modelled projection against current operation, drawn from plant schematics and historical operating data. Figures are projected, not measured. They will be replaced with verified results once SyMa has run a full season on site.

Projected, awaiting deployment

Detailed figures will be published only when measured against the agreed baseline.

Next step

A potential analysis on your plant.

Send us your schematics and recent operating data. We return a projection of where coordinated control would change the electricity bill on your specific plant.